- Rehabilitation of the Existing Irrigation Network in Agios Dimitrios area, near Kalambaka (section between Ch. 144+000 and Ch. 149+000 of the New E65 Highway alignment).
- Rehabilitation of the Existing Irrigation Network (Network of Lesini area and Zone 8 of Acheloos River Valley) in the framework of the final drainage design for the connection of IONIA ROAD with Astakos: Section between Gouria Bridge and Platigiali area (Ch. 7+200 to Ch. 20+300)
- Rehabilitation of the Existing Irrigation Network in the framework of the final drainage design for the construction of the new Highway Rizomilos - Kalamata in Peloponnese.
- Participation in the Final Study with title: "Technical Consultant for the hydraulic Works required in the rehabilitation of Karla Lake in Thessaly Prefecture".
In particular, the above mentioned studies include:
- Open Channel and Pipe Network.
- Thorough design for the rehabilitation of the existing irrigation network (design of the necessary irrrigation works, hydraulic calculations).
- Thorough study for the design of the new technical works needed for the restoration of the existing irrigation network under the new Highway alignment.
- Bill of Quantities - Budget for the Construction of the necessary Works